Connectors
SCADA, PLC and DCS, dosing and aeration controllers, membrane skids, analyzers, lab, utility MES, cameras and meters: what is read, what can be written, and how allow-lists and limits are declared.
Documentation is provided to design partners with the deployment. This page describes what it covers so a utility can judge the depth before signing anything.
Illustrative scenario: one municipal activated-sludge wastewater plant with a membrane train, planning the next 24 hours after a rain forecast. Not a measured run.
SCADA, PLC and DCS, dosing and aeration controllers, membrane skids, analyzers, lab, utility MES, cameras and meters: what is read, what can be written, and how allow-lists and limits are declared.
Sense, reason, act: how a run is planned, rehearsed, executed and recorded, and how the orchestrator arbitrates.
Predictions beside lab and analyzer results, corrections, approvals and how each feeds the training loop.
The immutable record format, model-version naming, export to the plant's quality and permit systems, and report drafting.
Stage per loop, tag allow-lists, rate and magnitude limits, named approvers, and how a policy is versioned and changed.
Versioning, evaluation gates, canary rollout, rollback and per-tenant routing.
Twin construction, data assimilation, surrogate fidelity, pre-shift evaluation and synthetic scenario generation.
Plant edge, cloud, on-prem and edge-only options, critical-infrastructure cybersecurity posture and what fails to what.
There is no SDK to download yet. What design partners get is the integration surface: connectors, an autonomy policy declared per loop, and an audit record for every reading, recommendation, write and approval. This is the shape of one record, illustrative.
// one write, as the audit log would hold it
{
"run": "run_scn_0418",
"step": "dose.write",
"agent": "agent.dose_coagulate",
"stage": "bounded",
"action": { "tool": "plc.write_setpoint", "tag": "DOS1.SP" },
"limits": { "max_step": "declared per tag", "per": "declared per tag" },
"evidence": ["analyzer.read_influent", "vision.fuse_state"],
"citation": "sop:DOSE-07 §3 · permit:NPDES-WWTP-A §II.A",
"permit_check": "inside margin",
"models": { "dose_response": "versioned", "policy": "versioned" },
"human": null,
"rollback": "38 mg/L",
"outcome": "42 mg/L · inside declared window"
}
Every Hydrira run is an ordered, inspectable sequence. This is run_scn_0418, an illustrative scenario: one municipal activated-sludge wastewater plant with a membrane train, planning the next 24 hours after a rain forecast. Ten steps, nine automatic, one human approval on the blower setpoint move, every action written to the shift record.
Intake-and-Screen · Flow, turbidity, ammonia and alkalinity at the headworks, and a 24-hour rain forecast that raises the expected influent by mid-afternoon.
Plant orchestrator · Simflo evaluates candidate dose, DO and flux plans over the 24-hour horizon and keeps the plans that hold permit margin through the surge.
Quality-and-Anomaly · Clarifier blanket, foam and colour from the basin cameras fused with turbidity, pH, nutrient and residual analyzers into one calibrated plant state.
Dose-and-Coagulate · Coagulant and polymer dose ramp for the surge window under turbidity, phosphorus, sludge and chemical-cost constraints, cited to the plant's dosing SOP.
Dose-and-Coagulate · A bounded setpoint move inside the declared rate and magnitude limits for the dosing pump, with the rollback value recorded first.
Aerate-and-Bio · Blower and DO setpoint schedule across the basins that meets the nitrogen and phosphorus targets at the lowest kilowatt-hours the biological state allows.
Plant orchestrator · The DO setpoint change is above the plant's threshold for this loop. The process engineer on shift reviews the predicted nutrient margin and approves.
Membrane-and-Disinfect · Flux held through the surge and the next backwash moved earlier, inside the integrity envelope; the disinfection residual minimum is untouched.
Compliance-and-Energy · Every planned setpoint checked against the discharge permit, the nutrient limits and the residual minimum, with excursion risk forecast for the horizon.
Quality-and-Conformance · Inputs, model versions, predictions, limits, the approval and every write appended to the immutable shift record the plant owns.
Every tool invocation, argument and result is written to an immutable, human-readable log, and every reasoning step is expandable. Nothing about a run is hidden from the plant. The log below is the scenario run, not a measured one.
Goal, plan, thought, action, observation, exactly as the orchestrator would record it.
Hold effluent turbidity, nutrients and disinfection residual inside the discharge permit for the next 24 hours while taking aeration energy and coagulant use to the minimum the permit margin allows.
Read influent and the forecast; rehearse the horizon on Simflo; fuse the plant state; compute dose and DO schedules; write the dose inside bounds; route the DO move for approval; hold flux and move the backwash; check the permit; commit the record.
Rain arrives mid-afternoon and the influent will rise by about a third. Dosing has to ramp before the surge, not after, and the DO schedule has to keep nutrient margin through it.
cuopt.solve_dose over a 12-hour window under turbidity, phosphorus, sludge and cost constraints; plc.write_setpoint on the coagulant pump inside the declared rate and magnitude limits.
The dose ramp holds predicted effluent turbidity under 2 NTU through the surge. The DO schedule saves energy but is above the threshold set for the aeration loop.
Energy never outranks permit margin. The DO change goes to the engineer with the predicted nutrient margin attached, and nothing is written until it is approved.
approve.request to the process engineer on shift; membrane.schedule_backwash to hold flux and move the next backwash ahead of the surge; permit.evaluate across the horizon.
Ten steps, one human approval, all parameters inside limit on the forecast, and the shift record written. Illustrative scenario; nothing here is a measured plant result.
What the plant sees, what keeps running (everything, on existing control), how the node rejoins and how the gap is recorded in the audit log.
Rolling a loop back to a previous model version, re-validating against the lab and the analyzers, and recording the reason.
Moving a loop between shadow, assist and bounded, the gates required, the compliance sign-off and who signs.
| Item | Limit or default |
|---|---|
| Writes | Only to tags on the plant's allow-list, inside declared rate and magnitude limits, at the declared autonomy stage |
| Never written | Permit-limit setpoints, disinfection residual minimums, integrity limits, interlocks, safety systems, discharge release decisions |
| Shadow mode | Zero writes; predictions logged against outcomes |
| Approval | Anything above the threshold waits for a named person; the request expires rather than executing late |
| Edge loss | The plant runs on existing SCADA, PLC and DCS control; the gap is recorded |
| Tenant isolation | Telemetry, permits, SOPs, models and memory scoped per tenant; federated learning opt-in and planned |
A plant does not go from manual to bounded control in one step. Hydrira makes the stage explicit per loop, auditable and reversible at any time, and some decisions never leave the person.
| Stage | What the agent does | What the person does | When |
|---|---|---|---|
| Shadow | Predicts water quality, fouling, excursion risk and energy; writes nothing | Runs the plant as today; compares predictions to lab, analyzer and SCADA outcomes | First phase with every design partner |
| Assist | Recommends dose, DO, flux and cleaning moves with predicted quality, energy and permit impact | Approves, corrects or rejects each move; corrections train the models | After accuracy is proven against the plant's own baseline |
| Bounded | Writes to an allow-list of low-risk loops inside declared rate and magnitude limits | Sets the limits, watches the record, pulls the loop back at any time | Per loop, after the assist-mode gate and compliance sign-off |
| Exceptions | Escalates anything above the threshold, every permit-adjacent move and every release | Decides; the operator of record is never removed from compliance decisions | Always |
Hydrira writes to control equipment in a plant that keeps a community's water safe. Every capability is scoped, every write is policy-checked, every output is cited, and every action is written to an append-only audit log the plant owns.
| Item | Scope | Status |
|---|---|---|
| SOC 2 Type I + critical-infrastructure cyber review | Cloud control plane, edge | QUEUED Roadmap, first 6 months |
| SOC 2 Type II | Cloud control plane | QUEUED Roadmap, 6 to 12 months |
| SDWA · discharge permits · EU WFD · nutrient and PFAS rules | Grounding and record-keeping | RUNNING Design basis for retrieval and the audit log |
| Per-tenant isolation | Data, memory, models | RUNNING Design rule |
| On-prem or edge-only deployment | Utilities, critical infrastructure | RUNNING Design option |
Hydrira supports your compliance records. It is not a certification, it does not replace your permit and it never removes the operator of record from a compliance decision.
Hydrira reads and writes through the systems already in the plant. No parallel historian, no new HMI, no rip-and-replace. Connectors are built against each design partner's stack first; long-tail integrations are out of scope for the first release.
Plant SCADA, historians, PLC and DCS interfaces
Tag reads at 1 to 10 Hz, guarded setpoint writes, interlocks untouched
Coagulant, polymer, pH-adjust and disinfectant dosing controllers
Dose reads, bounded setpoint writes inside declared limits
Blower controls, DO and ammonia-based aeration control
DO and blower reads, bounded setpoint writes after approval
Membrane and RO skid PLCs, TMP, flux, conductivity, integrity monitors
Reads; flux and backwash writes inside the integrity envelope
Turbidity, pH, chlorine residual, nutrient, TOC and flow analyzers
Reads; drift and fault flags
Lab information systems, jar-test and grab-sample records
Reads for labels and calibration
Fixed cameras on clarifiers, basins, filters and membrane rooms; inspection robots
Streams fused at the edge; supervised routes
Utility MES, maintenance systems, permit and reporting systems, weather
Reads; shift record and report drafts written back
The questions operations managers, process engineers and compliance leads ask in the first meeting.
Only at the autonomy stage your plant has set, and only to an explicit allow-list of low-risk loops inside documented limits. Every design partner starts in shadow mode, where Hydrira predicts and writes nothing. Assist mode follows, where a process engineer approves each move. Bounded write-back comes last, per loop, after the accuracy gate and compliance sign-off, and can be pulled back at any time.
No. Permit-limit setpoints, disinfection residual minimums, integrity limits and discharge release decisions are read and checked, never written. Permia evaluates every planned move against the permit set and blocks anything that would thin a margin. The operator of record stays the operator of record.
The plant keeps running on its existing SCADA, PLC and DCS control and interlocks. Hydrira is supervisory, not primary. Loss of Hydrira is loss of advice, and the gap is recorded in the shift record.
Shadow mode starts with the SCADA tags, analyzer streams and lab records you already have. Accuracy is measured against your own lab and analyzer baseline, and the first-release plan converts to assist mode only when the number is proven. The design targets assume telemetry you already collect, not new instrumentation.
Telemetry, permits, SOPs and models are tenant-scoped, and an on-prem or edge-only deployment is available for utilities. Cross-plant learning is federated and IP-isolated, planned and opt-in: patterns for similar basins, membranes and influent regimes move, raw data does not.
Not yet, and the site does not claim it. SOC 2 Type I with a critical-infrastructure cyber review is on the roadmap for the first six months, Type II for the six to twelve month window. Safe Drinking Water Act, discharge permit, EU Water Framework and nutrient and PFAS rules are what the retrieval grounds on and what the audit log is aligned to; that is a design basis, not a certification.
The one with the clearest number. Aeration energy on an activated-sludge plant, coagulant cost on a dosing train or membrane run length on an RO or MBR train are the usual wedges, because kilowatt-hours, chemical invoices and cleaning counts are already measured. Turbix is the sensing wedge where visibility is the first problem.
Two to four utilities or industrial sites instrument one wedge process in shadow mode and baseline energy, chemicals and compliance from their own records. Assist mode proves accuracy and ROI with an engineer approving each move. Graduated autonomy follows on low-risk loops. Expansion adds adjacent processes, then fleet sites. Gates, not dates.
Documentation ships with a design-partner deployment. Ask and we will walk you through it first.