Careers

Work on software that keeps a community's water inside the permit.

Hydrira is small and at the design stage. The roles below are the ones the first design-partner deployments need. They open as the cohort forms; there is no openings count to inflate.

Four role shapesPlant edge and GPUPermit first

run_scn_0418 · agent graph · scenario 10 nodes · 1 approval gate
01 · intake_screen Read influent and forecast ✓ SUCCEEDED 02 · orchestrator Rehearse the next 24 hours ✓ SUCCEEDED 03 · quality_anomaly Fuse cameras and analyzers ✓ SUCCEEDED 04 · dose_coagulate Compute the dose curve ✓ SUCCEEDED 05 · dose_coagulate Trim the coagulant setpoint ✓ SUCCEEDED 06 · aerate_bio Minimum-energy DO schedule ✓ SUCCEEDED 07 · orchestrator Blower move approved ◆ APPROVAL 08 · membrane_disinfect Flux hold and backwash timing ✓ SUCCEEDED 09 · compliance_energy Permit conformance check ✓ SUCCEEDED 10 · conformance Write the shift record ✓ SUCCEEDED

Illustrative scenario: one municipal activated-sludge wastewater plant with a membrane train, planning the next 24 hours after a rain forecast. Not a measured run.

Roles

Where we need people

Each role is written as a shape, not a job ad with a requisition number.

Vision and sensor fusion at the plant edge

Founding engineer · plant-edge perception

Own the camera and analyzer pipeline: clarity, foam, floc and anomaly models, analyzer fusion and drift correction, DeepStream and TensorRT on Jetson, Triton serving, and the latency budget that makes an excursion alert useful.

What you bring

  • Computer vision in production, ideally in an industrial or outdoor setting
  • Edge inference on Jetson or similar, with TensorRT or equivalent
  • Comfort calibrating models against noisy, drifting instruments

SCADA, dosing, aeration and membrane connectors

Founding engineer · OT integration

Build the connectors and the guarded write path: tag allow-lists, rate and magnitude limits, interlock awareness, rollback, and the audit record for every read and write across SCADA, PLC, DCS and skid controllers.

What you bring

  • OT and industrial automation experience: PLCs, SCADA, historians, OPC UA or similar
  • Respect for interlocks, safety systems and change control
  • Experience shipping software that touches real equipment

Simflo and cuOpt

Founding engineer · process twin and optimization

Build the as-run twin: data assimilation against live telemetry, Modulus surrogates for hydraulics, oxygen transfer, membrane flux and biological kinetics, candidate-plan search with cuOpt, and synthetic rare-event generation.

What you bring

  • Numerical simulation, surrogate modelling or physics-informed ML
  • GPU computing and optimization experience
  • Willingness to be wrong against the lab, and to recalibrate

Treatment process and compliance

Water-process engineer

Bring the plant: dosing, aeration, membrane and disinfection strategy, process windows, permits and SOPs. Shape what each agent is allowed to do, design the pilots with the first partners and decide what the models get wrong.

What you bring

  • Years operating or engineering water or wastewater treatment
  • Working knowledge of drinking-water standards, discharge permits and nutrient rules
  • Patience to explain operator craft to people who will encode it
How we work

Six things about working here

Trust before autonomy

Compliance, cybersecurity, grounding, audit, human-in-the-loop and graduated control come before any write to a plant.

Permit margin outranks energy

No saving is worth an excursion. The arbitration rules say so, and the code enforces it.

Corrections are the product

Every supervised correction trains the system. The craft of the operators we work with is what we are encoding.

Land narrow, expand on the number

One process, one baseline, one gate at a time, then the plant, then the fleet.

Honest status

Design stage, no plant connected, no result claimed. The site says so on every page.

Public water is public trust

The plants we work with keep communities healthy. We build as if a regulator is reading the record, because one will be.

Run timeline

What you would be building

Every Hydrira run is an ordered, inspectable sequence. This is run_scn_0418, an illustrative scenario: one municipal activated-sludge wastewater plant with a membrane train, planning the next 24 hours after a rain forecast. Ten steps, nine automatic, one human approval on the blower setpoint move, every action written to the shift record.

run_scn_0418 scenario · not measured SUCCEEDED
  1. 01 Read influent and forecast SUCCEEDED 1.2 s

    Intake-and-Screen · Flow, turbidity, ammonia and alkalinity at the headworks, and a 24-hour rain forecast that raises the expected influent by mid-afternoon.

  2. 02 Rehearse the next 24 hours SUCCEEDED 4 min 10 s

    Plant orchestrator · Simflo evaluates candidate dose, DO and flux plans over the 24-hour horizon and keeps the plans that hold permit margin through the surge.

  3. 03 Fuse cameras and analyzers SUCCEEDED 180 ms

    Quality-and-Anomaly · Clarifier blanket, foam and colour from the basin cameras fused with turbidity, pH, nutrient and residual analyzers into one calibrated plant state.

  4. 04 Compute the dose curve SUCCEEDED 2.4 s

    Dose-and-Coagulate · Coagulant and polymer dose ramp for the surge window under turbidity, phosphorus, sludge and chemical-cost constraints, cited to the plant's dosing SOP.

  5. 05 Trim the coagulant setpoint SUCCEEDED 0.6 s

    Dose-and-Coagulate · A bounded setpoint move inside the declared rate and magnitude limits for the dosing pump, with the rollback value recorded first.

  6. 06 Minimum-energy DO schedule SUCCEEDED 3.1 s

    Aerate-and-Bio · Blower and DO setpoint schedule across the basins that meets the nitrogen and phosphorus targets at the lowest kilowatt-hours the biological state allows.

  7. 07 Blower move approved APPROVAL 6 min 02 s

    Plant orchestrator · The DO setpoint change is above the plant's threshold for this loop. The process engineer on shift reviews the predicted nutrient margin and approves.

  8. 08 Flux hold and backwash timing SUCCEEDED 1.8 s

    Membrane-and-Disinfect · Flux held through the surge and the next backwash moved earlier, inside the integrity envelope; the disinfection residual minimum is untouched.

  9. 09 Permit conformance check SUCCEEDED 0.9 s

    Compliance-and-Energy · Every planned setpoint checked against the discharge permit, the nutrient limits and the residual minimum, with excursion risk forecast for the horizon.

  10. 10 Write the shift record SUCCEEDED 0.3 s

    Quality-and-Conformance · Inputs, model versions, predictions, limits, the approval and every write appended to the immutable shift record the plant owns.

Process

How hiring runs while the team is small

  1. A conversation. What you have built or run, and which of the four shapes fits.
  2. Something real. A working session on a treatment-plant problem from the product: an aeration basin, a dosing train, a membrane skid or a clarifier camera.
  3. The team. Time with the people you would work with, at a plant where possible.
  4. A decision. Fast, in plain language, either way.
Accelerated computing

Physical AI, at the plant edge

A treatment plant runs around the clock on variable influent, and many utilities keep plant data on site, so perception and control inference run at the plant edge. Hydrira keeps training, simulation and optimization in the cloud, in a private cloud or on-prem. Items marked planned are on the roadmap, not running.

Jetson Orin / Thor · TensorRT · DeepStream · Holoscan

Plant-edge inference

TensorRT-optimized time-series and vision models at the plant edge; DeepStream pipelines for clarifier, basin and filter cameras; Holoscan fusing camera streams with turbidity, pH, chlorine and nutrient analyzers at 1 to 10 Hz. Jetson Thor is planned.

Triton · NIM · NVIDIA AI Enterprise

Model serving

Water-quality forecasting, anomaly detection, control recommendation and compliance retrieval served with per-tenant routing, model versioning and an audit id on every call. Self-hosted for utility on-prem and edge deployment. Planned.

DGX / HGX · NeMo

Training and fine-tuning

Time-series transformers, vision models and NeMo-tuned process and compliance reasoning trained on plant telemetry, operator corrections, images, alarms, lab results, permits and SOPs. Design target: weekly fine-tuning per design-partner cohort, then monthly fleet refreshes. Planned.

Omniverse · OVX · Modulus

The as-run twin

Simflo runs plant hydraulics, clarifier and filtration behaviour, membrane fouling, oxygen transfer and biological response as a GPU simulation calibrated to the live plant, with Modulus surrogates for fast evaluation. Planned.

Cosmos · Omniverse Replicator

Synthetic rare events

Wet-weather surges, sensor drift, foaming, fouling, filtration breakthrough and biological upsets generated as scenario variants to stress-test autonomy and train the perception and control agents. Planned.

cuOpt

Optimization

Blower and pump scheduling, chemical dosing windows, membrane cleaning, backwash timing and fleet maintenance routes solved under energy tariff, labour, asset and permit constraints.

RAPIDS

GPU analytics

ETL over high-volume SCADA tags, lab results, membrane data, alarms and image metadata to build features and golden evaluation sets. Planned.

Isaac · Jetson

Robotics

Supervised robotic sampling routes, asset-inspection rovers and materials handling across intake, treatment and disinfection, where plant policy allows robots. Planned.

Autonomy

Four stages, set per loop

A plant does not go from manual to bounded control in one step. Hydrira makes the stage explicit per loop, auditable and reversible at any time, and some decisions never leave the person.

Autonomy stages and the human role at each
StageWhat the agent doesWhat the person doesWhen
ShadowPredicts water quality, fouling, excursion risk and energy; writes nothingRuns the plant as today; compares predictions to lab, analyzer and SCADA outcomesFirst phase with every design partner
AssistRecommends dose, DO, flux and cleaning moves with predicted quality, energy and permit impactApproves, corrects or rejects each move; corrections train the modelsAfter accuracy is proven against the plant's own baseline
BoundedWrites to an allow-list of low-risk loops inside declared rate and magnitude limitsSets the limits, watches the record, pulls the loop back at any timePer loop, after the assist-mode gate and compliance sign-off
ExceptionsEscalates anything above the threshold, every permit-adjacent move and every releaseDecides; the operator of record is never removed from compliance decisionsAlways
From the plant floor

Who this is built for

The three people in a treatment plant whose week changes when the process runs itself, and what each of them needs from Hydrira.

Economic buyer

Plant or Operations Manager

Owns compliance, reliability, energy, chemicals and cost. Wants autonomous, compliant, lower-energy, lower-chemical treatment, and a number that justifies the spend.

Champion

Process or Water Engineer

Owns dosing, aeration, membrane and biological strategy, the process windows and the performance. Needs recommendations they can inspect, correct and trust before any loop is handed over.

Approver

Compliance, Sustainability and Energy Lead

Owns permit compliance, water quality, energy and environmental reporting and the licence to operate. Needs every action cited, logged and defensible in front of a regulator.

IT/OT and critical-infrastructure cybersecurity leads approve the deployment. There are no customer quotes on this site yet; design partners will be the first voices.

Guardrails

An agent that can move a setpoint needs a leash

Hydrira writes to control equipment in a plant that keeps a community's water safe. Every capability is scoped, every write is policy-checked, every output is cited, and every action is written to an append-only audit log the plant owns.

  • Bounded action space. Each agent can only write to an explicit tag allow-list, inside per-tag rate and magnitude limits, at the autonomy stage the plant has set.
  • Permit limits are read, never written. Permit-limit setpoints, disinfection residual minimums, integrity limits and discharge release decisions stay with the permit and the operator of record.
  • Policy engine before every write. Autonomy stage, interlock state, permit margin, excursion forecast and operator presence are evaluated before a setpoint moves.
  • Grounded and cited. Every recommendation carries a citation to the permit, SOP or regulation it relied on. Retrieval is tenant-isolated and permission-aware.
  • Immutable audit log. Append-only, exportable and retained on the plant's own storage, aligned to Safe Drinking Water Act, discharge-permit and EU Water Framework record-keeping.
  • Hard fallback. If the edge node, the network or a model stops, the plant keeps running on its existing SCADA, PLC and DCS control and interlocks.
  • Tenant isolation and critical-infrastructure posture. Telemetry, permits, SOPs and models never cross a customer boundary. On-prem and edge-only deployment available for utilities.

Assurance posture

Assurance and certification status
ItemScopeStatus
SOC 2 Type I + critical-infrastructure cyber reviewCloud control plane, edge QUEUED Roadmap, first 6 months
SOC 2 Type IICloud control plane QUEUED Roadmap, 6 to 12 months
SDWA · discharge permits · EU WFD · nutrient and PFAS rulesGrounding and record-keeping RUNNING Design basis for retrieval and the audit log
Per-tenant isolationData, memory, models RUNNING Design rule
On-prem or edge-only deploymentUtilities, critical infrastructure RUNNING Design option

Hydrira supports your compliance records. It is not a certification, it does not replace your permit and it never removes the operator of record from a compliance decision.

Read the security overview

FAQ

Straight answers

The questions operations managers, process engineers and compliance leads ask in the first meeting.

Only at the autonomy stage your plant has set, and only to an explicit allow-list of low-risk loops inside documented limits. Every design partner starts in shadow mode, where Hydrira predicts and writes nothing. Assist mode follows, where a process engineer approves each move. Bounded write-back comes last, per loop, after the accuracy gate and compliance sign-off, and can be pulled back at any time.

Get started

Tell us what you want to own

Send what you have built. A person reads it.