Scenarios

No case study yet. Here is how one would be measured.

Hydrira has not run on a plant, so there are no results to report. These are scenario walk-throughs built from the product designs: what a pilot would instrument, what it would baseline, and the gate it would have to pass.

Four scenariosIllustrative, not measuredBaseline from your own records

run_scn_0418 · agent graph · scenario 10 nodes · 1 approval gate
01 · intake_screen Read influent and forecast ✓ SUCCEEDED 02 · orchestrator Rehearse the next 24 hours ✓ SUCCEEDED 03 · quality_anomaly Fuse cameras and analyzers ✓ SUCCEEDED 04 · dose_coagulate Compute the dose curve ✓ SUCCEEDED 05 · dose_coagulate Trim the coagulant setpoint ✓ SUCCEEDED 06 · aerate_bio Minimum-energy DO schedule ✓ SUCCEEDED 07 · orchestrator Blower move approved ◆ APPROVAL 08 · membrane_disinfect Flux hold and backwash timing ✓ SUCCEEDED 09 · compliance_energy Permit conformance check ✓ SUCCEEDED 10 · conformance Write the shift record ✓ SUCCEEDED

Illustrative scenario: one municipal activated-sludge wastewater plant with a membrane train, planning the next 24 hours after a rain forecast. Not a measured run.

Scenarios

Four walk-throughs

Each follows the first-release plan: shadow, assist, then bounded control only after the agreed gates.

Aeration energyAerix QUEUED

Activated-sludge plant, four basins, nutrient permit

Baseline. Kilowatt-hours per cubic meter treated from the plant's own blower meters, nutrient margin from the online ammonia and nitrate analyzers, and the upset count from the operator log, over the shadow period.

Walk-through. Shadow mode forecasts load and DO demand per basin and logs the minimum-energy schedule beside what the operators actually ran. Assist mode puts the schedule in front of the process engineer each shift. Bounded mode moves DO setpoints inside declared limits with Permia checking nutrient margin before every write.

Gate. Forecast accuracy against the analyzers and a measured kWh reduction with no nutrient excursion, before any write is enabled.

Chemical costCoagen QUEUED

Drinking-water plant, weather-driven influent, one dosing train

Baseline. Chemical cost per cubic meter from the invoice, settled and filtered turbidity from the lab and online analyzers, and sludge volume from the plant record, over the shadow period.

Walk-through. Shadow mode forecasts influent and logs the predicted dose beside the jar-test dose and the lab result. Assist mode recommends dose ramps ahead of forecast rain. Bounded mode trims the coagulant pump inside declared rate and magnitude limits.

Gate. Dose-response accuracy against the lab and a measured chemical reduction with turbidity held, before any write is enabled.

Membrane lifeMembraq QUEUED

Brackish RO train, scaling-prone feed water

Baseline. Run length between cleans, cleaning count and chemical use from the cleaning log, specific energy from the meter and integrity events from the monitor, over the shadow period.

Walk-through. Shadow mode predicts the TMP trajectory and logs the recommended cleaning window beside the timed clean. Assist mode recommends flux, recovery and backwash timing. Bounded mode holds flux and schedules backwash inside the integrity envelope.

Gate. Fouling-prognostics accuracy and a measured gain in run length with no integrity event, before any write is enabled.

VisibilityTurbix QUEUED

Clarifier and filter gallery, periodic grab sampling

Baseline. Lead time from drift to detection, excursion count and analyzer drift events from the lab record and the excursion log, over the shadow period.

Walk-through. One clarifier camera and one turbidity or chlorine analyzer are fused and calibrated against the lab. Alerts go to operators with severity and location. Soft sensors and more areas follow, and the perception API opens to the control products.

Gate. Alerts that precede the lab result on real excursions with an acceptable false-alarm rate, measured against the plant's own record.

Run timeline

Scenario: one shift on an activated-sludge plant, before the rain

Every Hydrira run is an ordered, inspectable sequence. This is run_scn_0418, an illustrative scenario: one municipal activated-sludge wastewater plant with a membrane train, planning the next 24 hours after a rain forecast. Ten steps, nine automatic, one human approval on the blower setpoint move, every action written to the shift record.

run_scn_0418 scenario · not measured SUCCEEDED
  1. 01 Read influent and forecast SUCCEEDED 1.2 s

    Intake-and-Screen · Flow, turbidity, ammonia and alkalinity at the headworks, and a 24-hour rain forecast that raises the expected influent by mid-afternoon.

  2. 02 Rehearse the next 24 hours SUCCEEDED 4 min 10 s

    Plant orchestrator · Simflo evaluates candidate dose, DO and flux plans over the 24-hour horizon and keeps the plans that hold permit margin through the surge.

  3. 03 Fuse cameras and analyzers SUCCEEDED 180 ms

    Quality-and-Anomaly · Clarifier blanket, foam and colour from the basin cameras fused with turbidity, pH, nutrient and residual analyzers into one calibrated plant state.

  4. 04 Compute the dose curve SUCCEEDED 2.4 s

    Dose-and-Coagulate · Coagulant and polymer dose ramp for the surge window under turbidity, phosphorus, sludge and chemical-cost constraints, cited to the plant's dosing SOP.

  5. 05 Trim the coagulant setpoint SUCCEEDED 0.6 s

    Dose-and-Coagulate · A bounded setpoint move inside the declared rate and magnitude limits for the dosing pump, with the rollback value recorded first.

  6. 06 Minimum-energy DO schedule SUCCEEDED 3.1 s

    Aerate-and-Bio · Blower and DO setpoint schedule across the basins that meets the nitrogen and phosphorus targets at the lowest kilowatt-hours the biological state allows.

  7. 07 Blower move approved APPROVAL 6 min 02 s

    Plant orchestrator · The DO setpoint change is above the plant's threshold for this loop. The process engineer on shift reviews the predicted nutrient margin and approves.

  8. 08 Flux hold and backwash timing SUCCEEDED 1.8 s

    Membrane-and-Disinfect · Flux held through the surge and the next backwash moved earlier, inside the integrity envelope; the disinfection residual minimum is untouched.

  9. 09 Permit conformance check SUCCEEDED 0.9 s

    Compliance-and-Energy · Every planned setpoint checked against the discharge permit, the nutrient limits and the residual minimum, with excursion risk forecast for the horizon.

  10. 10 Write the shift record SUCCEEDED 0.3 s

    Quality-and-Conformance · Inputs, model versions, predictions, limits, the approval and every write appended to the immutable shift record the plant owns.

Tool calls

The tool calls behind the scenario

Every tool invocation, argument and result is written to an immutable, human-readable log, and every reasoning step is expandable. Nothing about a run is hidden from the plant. The log below is the scenario run, not a measured one.

tool-call stream · run_scn_0418
  1. 05:40:02scada.read_influent({ plant: "WWTP-A", tags: ["FLOW", "NTU", "NH4", "ALK"] })
  2. 05:40:03ok flow 412 L/s · turbidity 118 NTU · ammonia 31 mg/L · alkalinity 184 mg/L
  3. 05:40:03weather.read_forecast({ horizon_h: 24 })
  4. 05:40:04ok rain from 14:00 · expected influent +38% by 17:00
  5. 05:40:04twin.simulate({ horizon_h: 24, candidates: 240, objective: ["permit_margin", "kwh", "chemical"] })
  6. 05:44:14ok 240 plans evaluated · 31 hold permit margin through the surge · best plan selected
  7. 05:44:15vision.fuse_state({ cameras: ["CLAR-1", "CLAR-2", "AER-3"], analyzers: "all" })
  8. 05:44:15ok blanket 1.1 m · foam none · effluent turbidity 1.8 NTU · residual 0.9 mg/L
  9. 05:44:16cuopt.solve_dose({ window_h: 12, constraints: ["NTU", "P", "sludge", "cost"] })
  10. 05:44:18ok coagulant ramp 38 → 46 mg/L from 13:30 · polymer unchanged · cite sop:DOSE-07 §3
  11. 05:44:19policy.evaluate({ loop: "dose", stage: "bounded", tag: "DOS1.SP" })
  12. 05:44:19ok permitted · max_step 4 mg/L per 15 min · rollback 38 mg/L
  13. 05:44:19plc.write_setpoint({ tag: "DOS1.SP", value: 42, unit: "mg/L" })
  14. 05:44:20ok written · ack from PLC · audit id 0418-05
  15. 05:44:20cuopt.solve_blowers({ basins: 4, constraints: ["NH4", "NO3", "P", "DO_min"] })
  16. 05:44:23ok DO 2.0 → 1.6 mg/L basins 1–3 from 06:00 · predicted −9% kWh · nutrient margin held
  17. 05:44:24policy.evaluate({ loop: "aeration", stage: "assist", tag: "BLW.DO_SP" })
  18. 05:44:24above threshold for this loop · routed to approve.human · engineer on shift notified
  19. 05:50:26approved by the process engineer on shift · reason: nutrient margin 0.6 mg/L above limit
  20. 05:50:27membrane.schedule_backwash({ train: "MBR-2", surge_at: "14:00" })
  21. 05:50:29ok flux held 24 LMH · backwash moved 16:00 → 13:15 · residual minimum untouched
  22. 05:50:29permit.evaluate({ permit: "NPDES-WWTP-A", horizon_h: 24 })
  23. 05:50:30ok all parameters inside limit · excursion risk 24 h: low · cite permit §II.A
  24. 05:50:30audit.commit({ run: "run_scn_0418", steps: 10, approvals: 1 })
  25. 05:50:30ok shift record written · immutable · exportable

Reasoning trace

Goal, plan, thought, action, observation, exactly as the orchestrator would record it.

GoalHold effluent turbidity, nutrients and disinfection residual i…

Hold effluent turbidity, nutrients and disinfection residual inside the discharge permit for the next 24 hours while taking aeration energy and coagulant use to the minimum the permit margin allows.

PlanRead influent and the forecast; rehearse the horizon on Simflo…

Read influent and the forecast; rehearse the horizon on Simflo; fuse the plant state; compute dose and DO schedules; write the dose inside bounds; route the DO move for approval; hold flux and move the backwash; check the permit; commit the record.

ThoughtRain arrives mid-afternoon and the influent will rise by about…

Rain arrives mid-afternoon and the influent will rise by about a third. Dosing has to ramp before the surge, not after, and the DO schedule has to keep nutrient margin through it.

Actioncuopt.solve_dose over a 12-hour window under turbidity, phosph…

cuopt.solve_dose over a 12-hour window under turbidity, phosphorus, sludge and cost constraints; plc.write_setpoint on the coagulant pump inside the declared rate and magnitude limits.

ObservationThe dose ramp holds predicted effluent turbidity under 2 NTU t…

The dose ramp holds predicted effluent turbidity under 2 NTU through the surge. The DO schedule saves energy but is above the threshold set for the aeration loop.

ThoughtEnergy never outranks permit margin. The DO change goes to the…

Energy never outranks permit margin. The DO change goes to the engineer with the predicted nutrient margin attached, and nothing is written until it is approved.

Actionapprove.request to the process engineer on shift; membrane.sch…

approve.request to the process engineer on shift; membrane.schedule_backwash to hold flux and move the next backwash ahead of the surge; permit.evaluate across the horizon.

OutcomeTen steps, one human approval, all parameters inside limit on …

Ten steps, one human approval, all parameters inside limit on the forecast, and the shift record written. Illustrative scenario; nothing here is a measured plant result.

Method

How we would measure, and what we would exclude

Baseline first

Every pilot starts in shadow mode. The baseline comes from the plant's own meters, lab, analyzers, cleaning logs and permit records, never from Hydrira telemetry.

Gates, not dates

Assist mode starts when prediction accuracy is proven; bounded control starts when assist-mode ROI is proven and the compliance lead signs. Each gate is written down before the pilot starts.

Excluded from the result

Anything the plant changed for other reasons during the pilot is excluded, and the exclusion is recorded with the reason.

Published only with consent

A scenario becomes a case study only when the design partner agrees to publish, with the numbers they have verified.

Design targets

Design targets the scenarios assume

The numbers Hydrira is engineered against, from the GPU utilization plan.

<100 ms per camera inference at the plant edge, on Jetson Orin
15–30 FPS foam, clarity and anomaly vision per camera
1–10 Hz sensor fusion across SCADA tags and online analyzers
8–24 h simulated on the as-run twin before each shift starts
50–500 candidate control plans compared per twin run
10k–100k synthetic surge, fouling and upset scenario variants per plant archetype

Design targets from the GPU utilization plan, all marked aspirational in the architecture. Nothing on this page is a measured plant result.

Engagement

How a design-partner engagement runs

Gates, not dates. Each stage starts when the previous one has proven its number against your own baseline.

  1. Design partners. Two to four utilities or industrial water sites instrument the wedge process in shadow mode. We measure the baseline on energy, chemicals and compliance from your own meters, lab, analyzers and permit records.
  2. Assist mode. The agent recommends dose, aeration or membrane moves and predicts quality, fouling and compliance; a process engineer approves each one. Accuracy and ROI are proven against the baseline.
  3. Graduated autonomy. Low-risk dosing, aeration or membrane loops move to bounded closed-loop control inside declared limits, with compliance gates and exceptions escalated.
  4. Expansion. Adjacent processes within the same plant, then fleet sites, with plant-edge fleet governance and the Simflo twin.
Autonomy

Four stages, set per loop

A plant does not go from manual to bounded control in one step. Hydrira makes the stage explicit per loop, auditable and reversible at any time, and some decisions never leave the person.

Autonomy stages and the human role at each
StageWhat the agent doesWhat the person doesWhen
ShadowPredicts water quality, fouling, excursion risk and energy; writes nothingRuns the plant as today; compares predictions to lab, analyzer and SCADA outcomesFirst phase with every design partner
AssistRecommends dose, DO, flux and cleaning moves with predicted quality, energy and permit impactApproves, corrects or rejects each move; corrections train the modelsAfter accuracy is proven against the plant's own baseline
BoundedWrites to an allow-list of low-risk loops inside declared rate and magnitude limitsSets the limits, watches the record, pulls the loop back at any timePer loop, after the assist-mode gate and compliance sign-off
ExceptionsEscalates anything above the threshold, every permit-adjacent move and every releaseDecides; the operator of record is never removed from compliance decisionsAlways
From the plant floor

Who this is built for

The three people in a treatment plant whose week changes when the process runs itself, and what each of them needs from Hydrira.

Economic buyer

Plant or Operations Manager

Owns compliance, reliability, energy, chemicals and cost. Wants autonomous, compliant, lower-energy, lower-chemical treatment, and a number that justifies the spend.

Champion

Process or Water Engineer

Owns dosing, aeration, membrane and biological strategy, the process windows and the performance. Needs recommendations they can inspect, correct and trust before any loop is handed over.

Approver

Compliance, Sustainability and Energy Lead

Owns permit compliance, water quality, energy and environmental reporting and the licence to operate. Needs every action cited, logged and defensible in front of a regulator.

IT/OT and critical-infrastructure cybersecurity leads approve the deployment. There are no customer quotes on this site yet; design partners will be the first voices.

Guardrails

An agent that can move a setpoint needs a leash

Hydrira writes to control equipment in a plant that keeps a community's water safe. Every capability is scoped, every write is policy-checked, every output is cited, and every action is written to an append-only audit log the plant owns.

  • Bounded action space. Each agent can only write to an explicit tag allow-list, inside per-tag rate and magnitude limits, at the autonomy stage the plant has set.
  • Permit limits are read, never written. Permit-limit setpoints, disinfection residual minimums, integrity limits and discharge release decisions stay with the permit and the operator of record.
  • Policy engine before every write. Autonomy stage, interlock state, permit margin, excursion forecast and operator presence are evaluated before a setpoint moves.
  • Grounded and cited. Every recommendation carries a citation to the permit, SOP or regulation it relied on. Retrieval is tenant-isolated and permission-aware.
  • Immutable audit log. Append-only, exportable and retained on the plant's own storage, aligned to Safe Drinking Water Act, discharge-permit and EU Water Framework record-keeping.
  • Hard fallback. If the edge node, the network or a model stops, the plant keeps running on its existing SCADA, PLC and DCS control and interlocks.
  • Tenant isolation and critical-infrastructure posture. Telemetry, permits, SOPs and models never cross a customer boundary. On-prem and edge-only deployment available for utilities.

Assurance posture

Assurance and certification status
ItemScopeStatus
SOC 2 Type I + critical-infrastructure cyber reviewCloud control plane, edge QUEUED Roadmap, first 6 months
SOC 2 Type IICloud control plane QUEUED Roadmap, 6 to 12 months
SDWA · discharge permits · EU WFD · nutrient and PFAS rulesGrounding and record-keeping RUNNING Design basis for retrieval and the audit log
Per-tenant isolationData, memory, models RUNNING Design rule
On-prem or edge-only deploymentUtilities, critical infrastructure RUNNING Design option

Hydrira supports your compliance records. It is not a certification, it does not replace your permit and it never removes the operator of record from a compliance decision.

Read the security overview

FAQ

Straight answers

The questions operations managers, process engineers and compliance leads ask in the first meeting.

Only at the autonomy stage your plant has set, and only to an explicit allow-list of low-risk loops inside documented limits. Every design partner starts in shadow mode, where Hydrira predicts and writes nothing. Assist mode follows, where a process engineer approves each move. Bounded write-back comes last, per loop, after the accuracy gate and compliance sign-off, and can be pulled back at any time.

Get started

Run the real measurement on your plant

A scenario becomes a case study when a design partner lets us baseline a process. That is the only way one gets written.